Finished Cobble at Coloma
Work in progress at GRCA Office
Directional Sign at Gold Flat
Directional Sign for Parke Place
Directional Sign for Parke Place #2
Directional Sign at Yuba Canal
Directional Sign at Yuba Canal #2
Directional Sign at Gold Rush
Directional Sign at Gold Rush #2
Removal of Directional at Gold Flat
Removal of Directional at Gold Flat 2
Directional Removal at Gold Flat 3
Directional Removal at Gold Flat 5
Removal of Directional at Gold Flat 6
Sign in China-Just finished the lettering
Sign in China-Worker etching lettering by hand
Sign in China-Letter etching
Sign in China-Directional signs
Sign in China-Directional signs getting holes bored into them
Installation of sign at Sunrise
New sign at Sunrise Entrance
New sign at Coloma Entrance
Form set up at Gold Flat #2
Foundation pour at Gold Flat
Foundation pour at Gold Flat #2
Foundation pour at Gold Flat #3
Finishing up foundation and form pour at Gold Flat
New Sign at Hazel Entrance
Crocker Grove-Last signs to go up
Crocker Grove-Last signs to go up
Forms setup on Sunrise entrance
Concrete pour on Coloma-Pic 2
Concrete pour on Hazel-Pic 2
Hesperian Sign Installation-Pic 1
Hesperian Sign Installation-Pic 2
Hesperian Sign Installation-Pic 3
Hesperian Sign Installation-Pic 4
Hesperian Sign Installation-Pic 5
Hesperian Sign Installation-Pic 6
Hesperian Sign Installation-Pic 7
Hesperian Sign Installation-Pic 8